
Retour aux projets
Tehran’s Water Telemetric and Remote Controlling
تلهمتری و کنترل از راه دور آب تهران
Tehran, Iran
Année de construction2005
Tehran, Iran
Achevé
Office Building
Tehran’s Water Telemetric and Remote Controlling was designed by Design Core [4s] Architects, Sam Tehranchi. The project won the 2nd Place in Memar Award, 2005.
Galerie
Emplacement
ApproximateLoading map…
Tehran, Iran(35.689, 51.390)