Alongside the winning, honoured and selected projects, the 6th Memar Award presented the other participating residential works. The following are those projects, listed with their design credits.
Summerhouse, Kelarabad — Marian Nasirpour
Location: Kelarabad, Deh Ahangar-Kola. Client & contractor: Naser Haddadzadeh. Construction: Marian Nasirpour. Technical office associate: Nadia Omara'i. Start & completion date: 1382 (2003). Total built area: 59 m². Photo: Kamran Adl.
Roya Building, Tehran — Zohreh Mehrabi
Location: Tehran, Shariati St., Gholhak fork, Sadegh St., North Motahhari St., Maghsoud St., Roya alley, No. 17. Client & structure: Seyyed Mehdi Alavi. Mechanical & electrical: Azadeh Tavakkoli Fard.

Dream House, Ferdows — Noushin Ghiyasi
Location: north of Baghestan-e Olya village, Sartakht neighbourhood. Construction: Noushin Ghiyasi. Structure consultant: Sa'id Safariyan. Mechanical & electrical consultant: Fatemeh Mohajer. Mud plaster: Hossein Esma'ili. Woodwork: Gholamreza Daneshvar. Mechanical & electrical services: Jafar Pourali. Photo: Soheila Beski, Davoud Asadollahvash. Total built area: 240 m².

Jamal Abad Residential, Tehran — Mehdi Sa'dvandi
Location: Tehran, Niavaran, Jamal Abad, end of Shahid Habi, corner of Nourafshar 3, No. 18. Client: Leila Fani Tabrizi. General supervision: Hashem Sabbaghian. Supervision: Mas'oud Vahdat Towhidi. Structure: Siyamak Saghari. Mechanical & electrical: Faryadras. Construction: Mas'oud Moghaddam. Start date: 1382 (2003). Completion date: Shahrivar 1385. Total built area: 2,094 m².

Akhavan Residential Building, Tehran — Reza Shokouhi
Location: Tehran, Shariati St., after Sadr bridge, Akhavan alley, No. 23. Client: Mohammadreza Mousavi & Partners. Construction: Reza Shokouhi. Total built area: 1,500 m². Start date: winter 1381. Completion date: spring 1383. Photo: Sara Ghorashizadeh.

Parvaneh Residential Complex, Isfahan — Mohammad Aghili
Location: Isfahan, Ayeneh-Khaneh Blvd., opposite the stadium. Client: Arian Ark Co. Design associates: Ahmad Mahlouji, Ali Karbaschi. Structure: Majid Tabesh, Asghar Hashemi. Mechanical: Keyvan Geramian. Electrical: Fazlollah Salem. Green space: Mehrdad Satari. Photo: Hedayatollah Golzar.

Farahzad 206-Units Residential Complex, Tehran — Kongereh-ye-Honar Consulting Engineers
Location: Tehran, Sa'adat Abad, Sarv Square, West Sarv St., Kouhestan St., Sahar St. Client: Housing cooperative of the Management and Planning Organization. Design & project manager: Mehdi Foroughmand Arabi. Architects: Forouhar Amirchoupani, Shahla Aliyari. Graphic: Amir Ebrahimi, Piyonik Simoni. Structure: Esma'il Pournahid. Mechanical: Majid Seyyednezhad. Electrical: Kiyanoush Naraghipour. Contractors: Taban Shahr Co., Beton Ajor Co., Tagh Cheshmeh Co. Total built area: about 31,000 m².

Ava Building, Tehran — Maziar Bahrami, Mehdi Alireza'i
Location: Tehran, Sa'adat Abad, Farhang Blvd., Qeyam Shahidi alley, No. 9. Client: Rahbarian & Partners. Design & project manager: Archi2 Architectural Studio. Mechanical: Ali Sadeghi. Electrical: Vafanezhad. Photo: Sa'id Shafii. Graphic: Elham Pardazimoghaddam. Film: Negar Javidtash. Completion date: Mordad 1385. Total built area: 6,875 m².

Asadabadi House, Kerman — Ali Davari
Location: Kerman, Jomhouri Blvd., Ghadir 2 Blvd., South Yas St., Yas 15 alley. Client: Ahmad Asadabadi. Design associates: Arezou Azizpour, Masoumeh Maneshian, Morteza Jafari. Construction: Peykav Naghsh Co. Mechanical: Behrouz Rezvani. Electrical: Reza Akbari. Structure: Naser Halavati.

Mehr Apartment, Mashhad — Farahnaz Emami
Location: Mashhad, Vakil Abad Blvd., Honarestan St., between Honarestan 9 and 11. Client: Khalil Sardar Amiri. Construction: Farahnaz Emami. Structure: Sae'id Javidi Niroumand.

Dornasar Villa, Mazandaran — Mehdi Gerami
Location: Mazandaran, km 33 of the Mahmoudabad–Nowshahr road, Varzvar village, Dornasar complex. Client: Zohreh Abhary. Design associate: Mostafa Rostamifard. Construction: Mehdi Gerami. Construction manager: Hojat Bagherkia. Structure: Farzad Farimanpour.

Villa No. 141, Narenj Complex, Royan — Harirchi & Associates Architects
Location: Mazandaran, Royan, km 5 of the Nowshahr road, Vazpul village, Narenj township, Narenj 4 St., No. 141. Client: Mohsen Ravedmand. Design team: Zand Harirchi, Ata'ollah Nikkholgh, Ali Sabetizadeh, Nasim Khojasteh Nikou, Shadi Seyyed Saqqa. Construction manager: Zand Harirchi, Ata'ollah Nikkholgh. Construction associates: Abbas Gordmard, Goudarz Goudarznia, Mohammad Lagha'i. Structure: Pirouz Amerian, Sadegh Amerian. Start date: spring 1380. Completion: spring 1383. Total built area: 615 m². Photo: Zand Harirchi, Mojtaba Ravedmand. Graphic: Ali Ha'eri, Banafsheh Piri.

Sabou Kouchak Villa, Lavasan — Hamid Imanirad
Location: Lavasanat, Sabou Kouchak village, Dar-Asiab road, after Tajdin St., first street on the right, No. 4. Client: Mr & Mrs Faghih. Interior design: Maryam Mesdaghi Bahari. Structure: Dariush Shahroudi. Mechanical & electrical: Farzad Khoda'i. Detailed drawing: Fatemeh Yadegar. Construction: Hamid Imanirad, Sa'id Shayan, Mehrdad Imanirad, Maryam Mesdaghi Bahari, Ramin Farzanehpour. Total built area: 175 m².

Mosha Villa, Damavand — Ramin Ghods, Behrouz Mansouri
Location: Damavand road, Mosha road, Shah St., end of the street, Beheshti villa. Client: Beheshti. Detail design: Ramin Ghods, Amir Mehdi Mastouri. Design associates: Elham Mastouri, Maryam Davoutabadi, Nahal Hamidi, Negar Javan. Structure consultant: Ya'ghoub Abedpour. Mechanical & electrical consultant: Amirhossein Akbarnezhad. Construction: Amir Mehdi Mastouri, Seyyed Kamal Hosseini. Start date: 1383 (2004). Completion date: Mehr 1385. Total built area: 500 m².

Nilchi Villa, Mazandaran — Ali Yarbakhti
Location: Mazandaran, Mahmoudabad, Khaneh-Darya township, East Caspian St., Cactus St., unit 104. Client: Bagher Nilchi. Structure: Pezhman Vahhab. Construction: Alireza Chomast. Start date: Farvardin 1383. Completion date: Shahrivar 1385. Total built area: 485 m². Photo: Ali Yarbakhti. Film: Rozbeh Naghshineh.

Nowamouz House, Karaj — Ali Yarbakhti
Location: Karaj, Mehrshahr, Shahrdari Blvd., 111th St., Erfan St., first building on the left. Client: Mozhgan Nowamouz. Structure: Pezhman Vahhab. Supervision & construction: Shahbaz Yarbakhti. Start date: Dey 1383. Completion date: Shahrivar 1385. Total built area: 585 m². Photo: Ali Yarbakhti. Film: Rouzbeh Naghshineh.

Moj Residential Complex, Tehran — Arthur Omid Azeri
Location: Tehran, Pasdaran St., end of Boustan 1 alley, corner of Mohsenian St., No. 21. Client: Hasan Khalili. Associates: Maryam Jafarbaglou, Hasan Moslemi, Danial Azeri, Hasan Rajabinezhad. Mechanical & electrical: Shahnazari. Structure: Khorshidi. Start date: 1379 (2000). Completion date: 1382 (2003). Total built area: 8,000 m².

Bahar Narenj Villa, Mazandaran — Mehdi Gerami
Location: Mazandaran, km 15 of the Mahmoudabad–Nour road, Bahar Narenj township, villa No. 3. Client: Ali Ghazanfari. Design associate: Mostafa Rostamifard. Construction: Mehdi Gerami. Mechanical: Ali Saroukhani. Structure: Farzin Ansari. Start date: Mehr 1382. Completion date: Mordad 1384. Total built area: 540 m².

Alagheband House, Yazd — Seyyed Mansour Alagheband
Location: Yazd, Jomhouri-ye Eslami Blvd., alley 56. Structure: Akbar Heidari. Mechanical & electrical: Mohsen Rezvanfar. Graphic: Mohsen Abbasi. Start date: 1380 (2001). Completion date: 1383 (2004). Total built area: 680 m².

Kaj Apartment, Karaj — Mahmoud Najari Sisi
Location: Karaj, Azimiyeh, Golestan Square. Client: Arash Faraji, Mohammad Fallah. Design associate: Houman Sharif Pouran. Construction: Mohammad Fallah. Construction manager & architectural supervision: Mahmoud Najari Sisi. Structure: Mansour Najari Sisi. Mechanical: Reza Ghodrati. Electrical: Jafar Samavat. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 1,740 m². Start date: Farvardin 1382. Completion date: Shahrivar 1383.

Yalda House, Galanduak — Parviz Forouzi
Location: Galanduak Blvd., Kandeh-Kola and Saghla junction, Boujan village, Laleh 5 alley. Client: Tahamtan Yalda. Structure: Ali Fousherian. Mechanical: Mostafa Tavakoli. Electrical: Mohammad Bagher Mohammadzadeh. Construction: Saeed Fath Ordoubadi. Start date: Ordibehesht 1381. Completion date: Shahrivar 1385. Total built area: 520 m².

Ashourian House, Isfahan — Mohammad Hossein Naghieh
Location: Isfahan, Upper Chaharbagh, between Mokhaberat alley and Harani, Golshan cul-de-sac, No. 108. Client: Hossein Aklili. Construction: Mohsen Aghili. Structure: Reza Naghieh. Mechanical & electrical: Naghshineh. Start date: Khordad 1382. Completion date: Mehr 1383. Total built area: 560 m².

Zafaranieh Residential Building, Tehran — Reza Shokouhi
Location: Tehran, Zafaranieh St., Asef St., Mehr St., Kouh-e Sefid alley, No. 22. Client: Mitra Tashayyodi. Supervision: Reza Shokouhi. Construction: Kianoush Gordiz. Total built area: 1,500 m². Start date: 1381 (2002). Completion date: 1383 (2004). Photo: Sara Ghorashizadeh.

9th Building, Tehran — Ali Kermanian & Associates
Location: Tehran, Fereshteh St., Takhti St., corner of 9th alley. Client: Masoudi & Partners. Drawings: Sirous Nesfat, Marjaneh Akhavein. Structure: Parviz Parsirad. Mechanical & electrical: Mohsen Cheheltani. Construction: Ali Kermanian, Farid Cheheltani. Start date: 1382 (2003). Completion date: 1385 (2006).

Villa, Kelardasht — Mo'in Mohammadi
Location: Kelardasht. Architect: Mo'in Mohammadi.

Ajin Dojin Villa, Kordan — Hossein Naseri
Location: Kordan, Ajin Dojin village, Aghaghia alley. Client: Mohammadreza Mohammad Taheri. Design associates: Negar Foroutan, Mandana Khazraie, Sara Azizian, Zohreh Mehrabi. Structure: Arash Naseri, Armin Milanian. Mechanical & electrical: Mehdi Mohareri, Reza Zamiri. Construction: Mohammad Taheri. Graphic: Rouzbeh Naghshineh. Photo & film: Hossein Naseri, Homayoon Hamdi, Abbas Moradi. Start date: 1383 (2004). Completion date: 1384 (2005). Total built area: 350 m².

Atashkouh Taban Villa, Lavasan — Tarh, Me'mari, Mohit Consulting Engineers
Location: Lavasan-e Kouchak, outskirts of Kand-e Olya village, Atashkouh interior. Client: Tahere Mohebbi Taban. Design: Masoud Nikhani. Design associates: Kaveh Bazrafkan, Zeinab Alizadeh, Maryam Nazari. Interior design: Tahereh Mohebbi Taban. Structure: Mohsen Kaka'i. Mechanical & electrical: Roshank Nilchiani. Construction: Masoud Nilchiani, Ali Abda'i. Film: Houman Ghodratmana, Neda Sharifzadeh. Photo: Tahereh Mohebbi Taban, Kaveh Bazrafkan. Start date: 1383 (2004). Completion date: Mordad 1385. Total built area: 230 m².

Artist's Villa, Lavasan — Seyyed Hamid Nourkeyhani
Location: Lavasan, Imam Khomeini St., Panah St., Seyed Peymar St., Saman 22, No. 7. Client: Behboudi, Jahangir. Associates: Bahar Zargar, Azadeh Kahvazadeh. Photo & film: Teli Nourkeyhani, Kaveh Seyyedahmadian. Structure: Forouzan. Mechanical & electrical: Akbar Vakili. Total built area: 534 m².

Souleghan Villa, Tehran — Piramoon Architectural Group
Location: Tehran, Emamzadeh Davoud road, after Souleghan village, Souleghan Payin fork, next to Tash restaurant. Client: Alireza Ahmadzadeh, Mina Najafi. Architects: Afshin Shahin, Shideh Takpournanesh Baghaie. Associates: Pantea Bidmeshki, Bahareh Joghataie. Structure: Majid Naghipour. Mechanical & electrical: Pirouz Shoushtarian. Construction: Afshin Shahin. Construction associate: Mehrdad Rahimi. Photo: Afshin Shahin. Start date: 1383 (2004). Completion date: Bahman 1385.

Mosta'jeran Apartment, Tehran — Mahmoud Najari Sisi
Location: Tehran, Nobonyad Square, Kabiz St. Client: Mehdi Mosta'jeran. Design associate: Hossein Sohrabbyk. Interior detail design & construction: Mehdi Mosta'jeran. Facade design & construction: Hossein Sohrabbyk. Construction manager & structure: Mehdi Mosta'jeran. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 2,900 m². Start date: spring 1381. Completion date: winter 1382.

Sisi Apartment, Karaj — Mahmoud Najari Sisi
Location: Karaj, Mehrvila, Toushirvan Blvd. Client: Sisi family. Design associates: Houman Sharifpouran, Rasoul Babamoradi. Architectural supervision: Mahmoud Najari Sisi. Structure & construction manager: Mansour Najari Sisi. Mechanical: Reza Ghodrati. Electrical: Jafar Samavat. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 2,400 m². Start date: Tir 1381. Completion date: winter 1382.

Zare' Residential Apartment, Karaj — Mahmoud Najari Sisi
Location: Karaj, Nazarabad. Client: Mansour Zare'. Design associate: Hamed Garousi. Construction: Mohammadreza Doroshkar. Architectural supervision: Mahmoud Najari Sisi. Mechanical: Reza Ghodrati. Electrical: Jafar Samavat. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 667 m². Start date: summer 1383. Completion date: summer 1384.

Seven Skies Complex, Isfahan — Arg Architectural Group
Location: Isfahan, Bozorgmehr bridge, Moshtagh 2 St., before Ghadir Blvd. complex, next to Tejarat Bank. Client: Mousavi Zahed. Architects: Arg Architectural Group — Mohammad Tanoorsaz, Mohammad Radan, Mohammadreza Moshkforoush. Structure: Seyyed Mahmoud Najafi. Mechanical: Seyyed Masoud Ziaa. Electrical: Kianzad. Construction: Rahchineh Sepahan Co. Start date: Ordibehesht 1383. Completion date: Aban 1385. Total built area: 2,400 m².

Ajudanieh Mansion, Tehran — Azhand Shahr Consulting Engineers
Location: Tehran, Aghdasieh, Ajudanieh St. (Shahid Sabzian), 6th alley, No. 2. Project manager: Kamran Goudarzi. Architects: Pouran Esma'ili, Sharareh Niknezhad. Construction manager: Kamran Goudarzi. Start date: 1383 (2004). Completion date: Esfand 1384. Total built area: 1,250 m².

Golestan Residential Building, Tehran — Seyyed Mohammadreza Kazemi
Location: Tehran, Tehranpars, Golestan township, next to Omid township. Structure: Behshid Faghihi. Mechanical: Kianoush Mohammadi. Start date: Mehr 1382. Completion date: Khordad 1384.

Saman Residential Building, Kerman — Farid Mahmoudi Sahba, Mozhdeh Sohrabi
Location: Kerman, Jomhouri-ye Eslami Blvd., Valfajr St., corner of alley No. 8. Client: Ahmad Shahmirzai. Structure: Isa Salajeghe, Javad Salajeghe. Mechanical: Arash Behizadeh. Electrical: Abbas Karimizadeh. Contractor: Karmania Home Design, Ahmad Shahmirzai. Start date: 1381 (2002). Completion date: 1383 (2004).

Saba Building, Tehran — Seyyed Mohammad Hossein Mortazavi
Location: Tehran, Pasdaran St., Kolahdouz St. (Dowlat), South Dibaji St., Sanjabi St., No. 43. Client: private investors (Gholian & Partners). Structure: Mohammad Gha'emi. Mechanical: Mohammad Gholian. Electrical: Reza Lotfabadi. Construction associate: Iman Monfared. Total built area: 811 m². Start date: Farvardin 1381. Completion date: Mehr 1382.

Aghigh Building, Tehran — Seyyed Mohammad Hossein Mortazavi
Location: Tehran, Pasdaran St., Kolahdouz St., South Dibaji St., Sanjabi St., Bazargani alley, No. 41. Client: Haghighi, Kazemi, Mortazavi. Structure: Mohammad Gha'emi. Mechanical: Talebi. Electrical: Reza Lotfabadi. Construction associate: Mohammad Amini. Total built area: 397 m². Start date: Azar 1380. Completion date: Esfand 1381.

Reihan Project, Tehran — Abdolreza Mohseni
Location: Tehran, Pasdaran, Aghdasieh, North Golestan St., Maryam cul-de-sac, No. 15. Design associate: S.M.H. Heydarshahi. Structure: Aliakbar Garmestani. Mechanical & electrical: Mahmoud Shirazian, Tavan Sanat Co. Landscape: Amir Salehi. Construction: Abdolreza Mohseni, S.M.H. Heydarshahi, Hedayat Nakhlestani. Start date: 1381 (2002). Completion date: 1385 (2006). Total built area: 2,300 m².

Renovation of a Residential House, Arak — Naghshinsaz Consulting Engineers, Sa'id Salehi
Location: Arak, Darayi Square, Imam Musa Sadr St., Nour alley, opposite Nour complex. Client & construction: Abbas Ghasemi. Start date: Tir 1381. Completion date: Mehr 1381. Total built area: 250 m².

Beheshti Villa, Shiraz — Soroush Saberi
Location: Shiraz. Client: Hamid Beheshti. Construction: Sina Saberi. Photo: Mo'in Mohammadi.

Taleghani Residential Complex, Tehran — Ali Kazemzadeh, Hamid Shahsavarani
Location: Tehran, Shariati St., before Taleghani junction, opposite Soroush cinema, Shahid Sevom St., No. 9. Client: Mohammad Haj Salimi. Structure: Behzad Vali. Mechanical: Hasan Mo'attar. Electrical: Ali Yarmohammadi. Construction: Ali Kazemzadeh, Hamid Shahsavarani. Start date: Khordad 1384. Completion date: Tir 1385. Total built area: 1,150 m².

Besmel Apartment, Karaj — Mahmoud Najari Sisi
Location: Karaj, Gohardasht. Client: Mehdi Besmel. Design associate: Hamed Garousi. Construction manager & supervision: Mahmoud Najari Sisi. Structure: Mansour Najari Sisi. Construction: Hamed Besmel. Electrical: Jafar Samavat. Mechanical: Reza Ghodrati. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 1,600 m². Start date: Ordibehesht 1383. Completion date: Esfand 1384.

Bahar Residential Building (Taxi-drivers' Cooperative), Karaj — Mahmoud Najari Sisi
Location: Karaj, Bahar St. Client: Mansour Kia'i. Design associate: Rasoul Babamoradi. Construction: Mansour Kia'i. Supervision: Abolghasem Amouzegar. Structure: Mansour Najari Sisi. Electrical: Jafar Samavat. Mechanical: Reza Ghodrati. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 25,072 m².

Tahmasebi Villa, Kordan — Mahmoud Najari Sisi
Location: Kordan, Aghesht village, before Baghan. Client: Kamran Tahmasebi. Design associate: Houman Sharif Pouran. Interior design associate: Hamed Garousi. Construction manager & supervision: Mahmoud Najari Sisi. Construction associates: Ashkan Shokoufi, Houman Sharif Pouran, Hamed Garousi. Structure: Mansour Najari Sisi. Electrical: Jafar Samavat. Mechanical: Reza Ghodrati. Photo: Shervin Shamlou. Total built area: 526 m². Start date: Mehr 1382. Completion date: Esfand 1383.

Shaghayegh 14 Residential Complex, Karaj — Mahmoud Najari Sisi
Location: Karaj, Mehrshahr, Azadi Blvd. Client & construction: Anbouhsaz Shaghayegh Co. Design associate: Rasoul Babamoradi. Structure: Mansour Najari Sisi. Electrical: Jafar Samavat. Mechanical: Reza Ghodrati. Photo: Maham Zarif Soltani, Mani Sahaam. Total built area: 9,940 m². Start date: Tir 1382. Completion date: Farvardin 1385.