This project is the expansion plan and the design of the assembly lines, warehouses, office and service spaces of one of the country’s oldest manufacturers of industrial electrical panels, fifty years old. The client asked for the design of the office building, production building and entrance gateway of the complex, alongside the renovation of the existing office building. On the basis of our studies we arrived at combining the office building and the warehouses next to the production hall, a decision that preserved much of the land as green space for the staff to play in.
So the production shed was placed in the southern part of the site and the warehouse building, as an elongated rectangle, to its north; the building’s first floor was given to cabinet work and the assembly of electrical cabinets, and the second floor to office space.
The facades of the buildings were designed to suit the function and the industrial atmosphere of the factory: for the production shed we chose a conventional sandwich-panel facade; in the office building we continued the sandwich panel for the warehouse, and on the office floor we added louvres to control light, inspired by the factory’s products. In fact the factory itself is producing itself.
Another serious strategy of ours is to minimise energy consumption.
In the interior design, natural elements such as light and plants are a metaphor for the presence of nature in the harsh, soulless industrial space of the factory, softening the spatial and visual quality of the project.
In the interior design of the office section, special emphasis was placed on unity, dynamism and movement through a fluid form, from the factory’s main lobby to the office spaces and finally back to the main facade in the form of the roof-access stair.