The project plot is a northern one, with access from two separate dead-end lanes. The elongation along the length of the plot (35 m) against its small width (11 m), and also the construction of 3 of the project's 4 floor slabs, were among the main challenges shaping the concept of the Meydan Kochak project.
Facing a concrete frame that had taken shape on the basis of earlier views, and that created many limitations on change in every part, was the project's initial challenge. In fact, at first the designer had been engaged to design the project's southern facade, but because of the poor quality of the spaces on the north side, the changes penetrated the whole project, and in the most fundamental decision, instead of designing the southern facade, the project's northern facade (the void on the north side) was designed, in such a way that, through the penetration of open space into the mass of the building by creating terraces drawn deep into the building, the quality of the spaces created (the rooms) on the north side would be secured.
Another basic decision of the project, in the direction of the penetration of outside space, was the creation of a courtyard in the middle of the project by opening the roof slab and drawing the outside inside on the project's top floor. A place where the space can turn into an interior space when the glass roof is closed, while, when the glass roof is opened, an unmediated connection with the sky is experienced from within the space of the house. Also, by using a glass partition, the courtyard has placed itself between the living space and the kitchen.