Although the city of Tehran does not, specifically and officially, have a central business district (CBD), because of the quality and kind of urban services and access, areas of it are gradually, in an informal or formal process, turning to office use.
The Zagros Petrochemical building, on Vanak Street (as an important part of Tehran's office areas), was built in 1393 with a residential permit and with a simple, changeable initial construction, and in 1398 it was taken over as a whole by the Zagros Petrochemical Company (as its first user). In the client's definition of the project, the scope of intervention was set as the first to fourth floors plus the ground-floor entrance lobby.
With the definition of office use in the building and the removal of all the internal divisions of the spaces, it was possible for the whole floor area to be laid out as partitioned office spaces. In contrast, the overall design approach was based on concentrating the partitioned work spaces in two parts, north and south, instead of covering the whole floor area uniformly with the various uses needed by office spaces, and the leisure/service spaces in the middle zone of the project, in close relation with the central lightwell and the existing vertical circulation.
Given that the building's external walls were fixed as a premise, the main potential for connecting the interior spaces with the qualities of the "outside" was seen in the central lightwell, and this element has been reinforced in the project by maximum transparency of its walls, being terraced, the creation of a secondary figurative staircase to strengthen vertical connection, and the addition of a green wall.
The project's new spatial divisions and interior form have taken shape by drawing a specific set of decisive lines: the blue zone as an extended boundary to define the leisure/collective space, the thin black line that defines the partitioned office spaces, and the thick black line that defines the boundary between outside and inside and also its extension.
In interaction with the programme received from the client, in each northern or southern office zone a closed room has been provided for the management of that section.
On the fourth floor the company's management section has been placed, and, with the removal of the blue zone because of the difference in the floor's programme, the whole floor has been finished in the neutral colours white, grey and black. The green wall extends up to this floor, and the lightwell staircase at the highest level connects to the foyer of the conference hall on this floor. This same minimalist approach has also been used in the entrance lobby, with a range of materials similar to the fourth floor.