
Before renovation, the lobby consisted of two surfaces with an approximate two-meter difference in height connected by stairs, in other words, two inactive spaces and an access path. Since, cinema is essentially cinematic, it is not compatible with inactivity.
Tehran, Iran(35.689, 51.389)
Semifinalists — Public Buildings
The Editor
No comments yet. Be the first to share your thoughts.