Semifinalists — Public Buildings
The Editor

Before renovation, the lobby consisted of two surfaces with an approximate two-meter difference in height connected by stairs, in other words, two inactive spaces and an access path. Since, cinema is essentially cinematic, it is not compatible with inactivity.
Tehran, Iran(35.689, 51.389)
Aucun commentaire. Soyez le premier à partager vos réflexions.